Day 1 Frame Assembly

Arrived at the site at 7:30 to await the arrival if crane, kit and assembly crew. By 8:30 the first of two trucks was being unloaded.

Truck 1 unloaded and we had the first wall panel in place before a break for coffee at 10:30.

Then the fun began when the crane refused to restart. Two faults with the geriatric crane meant it was 3:00 before we could get going again but at least all the external walls and most of the steelwork was in place by 7:00